Pages

Thursday, February 28, 2013

Ride Schedule Change

After much consultation with the powers that be, it was decided to postpone this Saturday's Rite of Spring Classic; Around The Bay ride until the following Saturday.

This decision was prompted mainly by the weather forecast for the two Saturday's in question, coupled by the lack of serious miles by most of the peloton because the over abundance of water falling from the heavens. (It means, fewer miles because it's been raining so much). This Saturday at start time, it is forecasted to be 40 degrees and no more than around 50 by the time we're finishing up. Therefore, we are doing one of our group favs; Pine Forest Loop with a Starbucks stop. Next Saturday is forecast for a low of 62 degrees and topping out in the mid 70s...in was a no-brainer. Here are the details for both rides:

This Saturday, 3.2.13:

Pine Forest Loop. About 45 miles. Start at Maygarden and Summit at 8am. Moderate pace.

Next Saturday, 3.9.13:

Rite of Spring Classic; Around The Bay. 65 miles. Start at Maygarden and Summit at 7am. Moderate pace.

Hope this will alleviate any confusion. If not, oh well. There are more serious problems in the world. If that doesn't help, call the Bad Mayonnaise.

See you out on the road,
Bob

No comments:

Post a Comment